TECHNOENGINEERING

Държава
България
Основна дейност
Електроенергия, Заваряване, Металообработка: Полуготови изделия, Металообработка: Рязане с винт, Плазмено заваряване, Промишлени услуги
Специализирано оборудване
Колонна бормашина , МиГ заваряване , Мостови/Портален кран , Оборудване за газопламъчно рязане , Огъваща машина - Тръби
Обработвани материали
Алуминий, Бронз, Въглеродна стомана, Мед, Месинг, Хром, Цветни метали, Черни метали
Сфера на приложение
Енергетика/Ядрена енергетика, Индустриални подизпълнители, Строителство, Химична
Продукти
MANUFACTURING, INSTALLATION, MAINTENANCE : - Pipe supports; - Belt conveyors; - Silos, Tanks, Pressure Vessels; - ESP/Electrostatic Precipitators/, SCR (Selective Catalytic Reduction), Bag Filters; - Support Structures, Hoppers, Casings, Stairs and Walkw
Услуги
INSTALLATION, REPAIR AND MAINTENANCE : - Boiler equipment; - Equipment for coal and ash transport - belt conveyors; - Аir heating installations; - ESP /Electrostatic Precipitators/; - Industrial waste water purification systems; - Sulfur cleaning equipm


Име
TECHNOENGINEERING
Адрес
6000 Stara Zagora, Bulgaria 89 Hadzhi Dimitar Asenov Str., fl.3, office 3
Телефон
+35942966 069
Лице за контакти
Stefanov
D.U.N.S номер
503488383
ДДС Номер
BG123759274
Описание
The areas of activity of the company "Technoengineering" Ltd. Is in energy-thermal power plants, chemical, cement, mining and processing industries . The main scopes are:- Installation, repair, reconstruction, production and maintenance of machinery and equipment and related installations ;- Manufacturing of metal structures, construction, spare parts and etc."Technoengineering" Ltd. possesses the necessary competence for realization of engineering services including the following main activities: Machine-technology partBoiler equipment;Repair of equipment for coal and ash transport;Sulfur cleaning equipment and installations;Installation and replacement of technological equipment;Repair of high and low pressure pipelines;Metal Structures (Manufacturing and Installation);Pipelines and pressure vessels.Electrical partExecution of any electrical installation of buildings and facilities;Cable systems ;Secondary communication;Cabling.Control and AutomationInstallation of pulse lines;Pipe tracing;Measuring instruments.Alpine methodThe company owns an attestation for the execution of Construction and Assembly Works (CAW) by cable access, issued by the Association of the Alpine Method Workers (The Bulgarian equivalent of IRATA).Workshop for metalworking.We can produce goods from different materials:– carbon and stainless steel, non-ferrous metals;Different sizes and grades can be agreed upon and delivered according to customer‘s request:- steel sheets and plates, wear resistant steel, pipes and tubes, hot rolled products, hollow sections, european profiles; Metalworking processes used in our production:- Plasma and gas-oxygen cutting of sheet/plate and tubular material;- bar material Cutting, Bending sheet material, Turning, Milling, Drilling and etc;- Mig, Tig, Electric Welding, Cladding , Hardfacing;- Sandblasting, Liquid PaintingEquipment:CNC portal machine with rotating head for cutting of sheet and tubular material by plasma and gas-oxygen cutting; 4-roll plate bending machine;three-phase tubular bending machine with shape and contralto for bending of black steel pipes;Horizontal band saw cutting machines ;Universal lathes;Universal milling machines;Drilling machines;Welding machines and equipment .